It's going to be real! The visualization of home improvement plans started to fall into places. Every weekend hubby and I have an appointment to visit our soon to be new home. The construction is ongoing and as we visit, we are happy to see the progress of the home improvement. It was in week 3 of our home improvement when the concrete slab was built due for drying, and the toilet and bathroom was removed for relocation. As you can see in the picture above the stairs were … [Read more...] about Home Improvement at Las Palmas Week 4
house renovation at Las Palmas subdivision Caypombo Bulacan
Home Improvement at Las Palmas Week 3
It was week 3 for our home improvement in Las Palmas subdivision when we visited the site. In my previous post about Home improvement week 2, the contractor just prepared the setup for the provision of second floor concrete slab and now the concrete slab was built. The comfort room in the ground floor was removed and the setup for the provision stairs was created. Concrete drying or curing time is two weeks. At the back of the house, the lavatory was removed and the setup for the relocation of … [Read more...] about Home Improvement at Las Palmas Week 3